BIJLIWISE
PM Surya Ghar: Muft Bijli Yojana (Cabinet Approved 29.02.2024)

PM Surya Ghar Subsidy & Solar Rooftop Calculator

Calculate recommended rooftop solar capacity (kW), statutory Central Financial Assistance (CFA up to ₹78,000 via Direct Benefit Transfer), illustrative net investment, monthly bill savings, and simple payback period across India.

PM Surya Ghar: Muft Bijli Yojana Official Subsidy Rules

Rooftop Solar Subsidy & ROI Calculator

MNRE Cabinet Approval: 29.02.2024
Calculate By:
₹

Estimated consumption: ~300 kWh/mo via state tariff profile. Sized at ~120 kWh/kW.

★ Approved Retail Slabs (MERC)

Avoided bill modeled using approved MERC domestic retail slabs & fixed charges. Surplus export estimated via historical benchmark.

Individual Home

Eligible for statutory CFA up to ₹78,000 maximum.

System Cost Planning Assumption:

Assumed at ₹58,000/kW. System costs vary by installer, module tech, and structure. MNRE does not mandate installer costs.

Immediate Financial & Technical Sizing Summary

A 2.5 kW system offsets approximately 300 kWh/month, addressing daytime consumption while retaining eligibility for the statutory PM Surya Ghar subsidy bracket.
1. Recommended System
2.5 kW
Needs ~200-250 sq ft roof
2. Monthly Generation
~300
Units (kWh) / month
3. Central Subsidy (CFA)
₹69,000
Direct Benefit Transfer (DBT)
4. Gross System Cost
₹1,45,000
Assumption @ ₹58,000/kW
5. Net Investment
₹76,000
Gross Cost − Central Subsidy
6. Savings & 7. Payback
₹3,042.22/mo
Payback: 2.1 Years
Statutory Central Financial Assistance (CFA)

PM Surya Ghar Subsidy: ₹69,000

Direct Benefit Transfer (DBT) credited to consumer bank account following DISCOM commissioning and portal inspection.

Statutory Central CFA
₹69,000

Non-negotiable statutory subsidy rate determined by MNRE guidelines.

Illustrative System Cost
₹1,45,000

Planning assumption @ ₹58,000/kW. (Varies by vendor).

Net Consumer Out-of-Pocket
₹76,000

Effective net capital investment after receipt of Central DBT subsidy.

Statutory Tier Breakdown (General Category):
  • First 2.0 kW at ₹30,000/kW = ₹60,000.
  • Additional 0.5 kW at ₹18,000/kW = ₹9,000.
  • Total CFA subsidy = ₹69,000.
State Government Subsidy Status:

No additional state subsidy included. Calculation reflects strictly the Central Financial Assistance (CFA) under PM Surya Ghar. Any DISCOM or state top-up subsidies are subject to separate local state government notifications and are not bundled into this statutory estimate.

National Subsidy Cap:Within statutory bracket
Transparent Energy & Billing Math

How We Calculated Your Solar Bill Savings

Strict energy conservation: Generation = Self-Consumed on-site + Exported to grid. Exported units receive APPC/avoided cost benchmark credits, not full retail rates.

1. On-Site Self-Consumption (~60% Planning Model)
180 kWh / mo

Displaces retail grid power during daytime hours, offsetting your highest domestic tariff slab.

Saves: ₹2,622.22/mo
2. Surplus Grid Export (~40% Planning Model)
120 kWh / mo

Exported to grid via bidirectional net-meter, estimated at historical APPC/feed-in benchmark (₹3.5/kWh).

Credits: ₹420/mo
3. Grid Fixed Charges Remaining
₹130 / mo

Mandatory DISCOM fixed charges, meter rent, and duties remain payable regardless of generation.

No ₹0 Bill Claim
4. Net Monthly Bill After Solar
₹685.5 / mo

Down from ~₹3,727.72/mo baseline grid bill.

Net Savings: ₹3,042.22/mo

*Export Settlement Disclosure: In distributed rooftop solar, surplus electricity exported to the grid is credited at state APPC or feed-in benchmarks, NOT at retail tariff rates. The 60% on-site self-consumption / 40% export allocation is an illustrative engineering planning assumption based on daytime domestic concurrency, not a statutory net-metering settlement rule. Actual annual banking or net-billing settlement is governed by your local DISCOM and SERC orders. Under WBERC regulations, net-metered rooftop solar operates via unit banking only. Unadjusted surplus energy at the financial year-end is treated as inadvertent injection and receives no utility cash payout.

Rooftop Shadow-Free Space CheckAdequate Area
200 - 250 sq ft

Your available 350 sq ft accommodates the required shadow-free space for a 2.5 kW system.

Benchmark: ~80 to 100 sq ft per installed kW for modern mono-PERC / TOPCon modules
DISCOM Sanctioned Load CheckLoad Compliant
3 kW Connected Load

Your sanctioned load (3 kW) is compliant for a 2.5 kW rooftop solar connection.

DISCOM rule: Net-meter inverter capacity must not exceed sanctioned load without enhancement
Official Source & Regulatory ProvenanceZero-Fabrication Standard
Official Scheme Authority

Ministry of New and Renewable Energy (MNRE), Government of India

PM Surya Ghar: Muft Bijli Yojana (Cabinet Approval: 29.02.2024, ₹75,021 Cr outlay).

Official National Portal

pmsuryaghar.gov.in ↗

Applications, vendor empanelment, and DBT subsidy disbursements are managed exclusively through this official portal.

State Tariff Regulatory Commission

Approved MERC Domestic Retail Tariff

Displaced units are modeled using approved domestic retail tariffs. Surplus export is estimated using indicative historical APPC benchmarks.

Statutory Central Financial Assistance (MNRE)

PM Surya Ghar 2026 Subsidy Structure & Sizing Benchmarks

Direct Benefit Transfer (DBT) rates notified under Ministry of New & Renewable Energy (MNRE) Cabinet Approval.

Official Portal Guidelines↗
1 kW Solar Rooftop1-BHK / Base
₹30,000 Subsidy
(₹33,000 in Special Category States)
Gross Cost (Est.):₹60,000 – ₹65,000
Net Investment:₹30,000 – ₹35,000
Monthly Output:~120 Units (kWh)
Rooftop Needed:~80–100 sq ft
Est. Payback:2.8 – 3.4 Years
2 kW Solar Rooftop2-BHK / Popular
₹60,000 Subsidy
(₹66,000 in Special Category States)
Gross Cost (Est.):₹1,20,000 – ₹1,30,000
Net Investment:₹60,000 – ₹70,000
Monthly Output:~240 Units (kWh)
Rooftop Needed:~160–200 sq ft
Est. Payback:2.7 – 3.3 Years
3 kW Solar Rooftop★ Max Central Subsidy
₹78,000 Max Cap
(₹85,800 in Special Category States)
Gross Cost (Est.):₹1,75,000 – ₹1,90,000
Net Investment:₹97,000 – ₹1,12,000
Monthly Output:~360 – 400 Units (kWh)
Rooftop Needed:~240–300 sq ft
Est. Payback:2.9 – 3.6 Years
Note for Systems >3 kW: For residential individual homes, central CFA subsidy is capped at a maximum of ₹78,000 (or ₹85,800 in special category states). Capacities above 3 kW can still be installed with full net-metering benefits, but do not receive additional central subsidy.
Compliance Requirements

PM Surya Ghar: Statutory Eligibility Criteria (MNRE Guidelines)

Verify whether your residential premises qualify for direct central Direct Benefit Transfer (DBT) subsidies:

✓1. Indian Citizenship & Residential Status

The applicant must be an Indian citizen residing in an independent house or apartment with legal roof access rights. Commercial and industrial properties are ineligible for this scheme.

✓2. Active Domestic DISCOM Connection

A valid residential LT (Low Tension) electricity connection with your local DISCOM is mandatory. The electricity bill must be in the applicant's or family member's name.

✓3. Adequate Shadow-Free Rooftop Area

Must possess approximately 80 to 100 square feet of shadow-free rooftop space per 1 kW of installed solar panels (e.g. 250–300 sq ft for a standard 3 kW system).

✓4. ALMM & Domestic Content (DCR) Compliance

Installed solar PV modules must be manufactured domestically with Indian solar cells/wafers (DCR compliant) and listed under MNRE's Approved List of Models and Manufacturers (ALMM).

✓5. Official National Portal Registration (pmsuryaghar.gov.in)

Subsidy is strictly disbursed via Direct Benefit Transfer (DBT) into the consumer's bank account after online registration on the national portal, DISCOM technical feasibility sanction, installation by a portal-empanelled vendor, and bidirectional net-meter commissioning.

Official Portal Application Guidance

5 Steps to Get PM Surya Ghar Installed via pmsuryaghar.gov.in

Open National Portal↗
1

Register on National PM Surya Ghar Portal

Submit application at pmsuryaghar.gov.in using your DISCOM consumer number and registered mobile number.

Visit Portal ↗
2

DISCOM Technical Feasibility Approval

Local DISCOM reviews transformer capacity and sanctioned load. Load enhancement may be required if solar kW exceeds sanctioned load.

3

Select MNRE Empanelled Vendor

Contract an authorized vendor from the portal. Verify modules are ALMM-listed and DCR-compliant.

4

Net-Meter Installation & DISCOM Inspection

DISCOM installs bidirectional meter and issues the commissioning certificate.

5

Direct Benefit Transfer (DBT) Subsidy Disbursement

Subsidy is disbursed directly into your bank account via Direct Benefit Transfer (DBT) under the PM-Surya Ghar scheme after applicable DISCOM net-meter inspection, commissioning certificate generation, and online portal verification are completed.

🛡️BijliWise Regulatory Disclaimers & Truth Gate
  • NO GUARANTEE: Solar generation figures, bill reductions, and payback periods are engineering models based on meteorological averages (~4.0-4.5 kWh/kWp/day) and do not constitute a financial guarantee.
  • NO ZERO BILL: Grid-connected systems remain subject to statutory DISCOM fixed charges, meter rent, and electricity duty regardless of solar generation.
  • EXPORT ECONOMICS: Net-metering settlement and surplus banking rates are determined by state electricity regulatory commissions (SERCs). Surplus export beyond consumption is credited at APPC/feed-in rates, not retail rates.
  • TECHNICAL APPROVAL: Actual installation is contingent on DISCOM distribution transformer capacity and net-metering technical feasibility approval.
Optional Assistance

Need Help with Local Portal-Empanelled Installers?

Direct self-application on pmsuryaghar.gov.in is completely free and requires no intermediary. If you want a local empanelled solar installer in your district to visit for an on-site shadow assessment and structural quote, you can optionally request contact:

Estimated Subsidy₹69,000
100% Free • Zero Obligation • Official National Portal application remains fully accessible independently.

PM Surya Ghar Muft Bijli Yojana: Economics & Subsidy Structure

The Government of India’s PM Surya Ghar: Muft Bijli Yojana provides Direct Benefit Transfer (DBT) capital subsidies to accelerate residential rooftop solar adoption. Solar systems can substantially reduce your variable energy charges by displacing grid electricity during peak daytime hours. Statutory DISCOM fixed charges, meter rent, and applicable electricity duties remain payable to your local utility.

Rooftop Solar Benchmark Cost, Subsidy & Generation Matrix (2026)

*Note: System costs below are illustrative planning assumptions (assuming typical market scale of ~₹50,000 to ₹65,000/kW) and are not fixed or mandated by MNRE. Actual quotes depend on vendor, module efficiency, structure, and inverter specifications. The PM Surya Ghar subsidy is a statutory Direct Benefit Transfer (DBT) credited directly to your bank account.

System Size (kW)Illustrative System CostPM Surya Ghar Subsidy (Statutory CFA)Illustrative Net InvestmentMonthly GenerationEst. Payback
1 kW Solar System₹62,000₹30,000 (₹33k Special)₹32,000~120 Units~2.8 - 3.4 Yrs
2 kW Solar System₹1,20,000₹60,000 (₹66k Special)₹60,000~240 Units~2.7 - 3.3 Yrs
3 kW Solar System (Optimal Tier)₹1,75,000₹78,000 (Max) (₹85.8k Special)₹97,000~360 - 400 Units~2.9 - 3.6 Yrs
5 kW Solar System₹2,60,000₹78,000 (Capped)₹1,82,000~600 Units~3.8 - 4.4 Yrs
10 kW Solar System₹4,90,000₹78,000 (Capped)₹4,12,000~1,200 Units~4.2 - 4.8 Yrs

Official Regulatory Evidence & Statutory Framework

To ensure full transparency and eliminate misleading marketing claims, BijliWise maintains a strict three-tier epistemic separation between statutory government policy, administrative utility procedures, and illustrative engineering assumptions:

1. Statutory Central Policy (MNRE)

Cabinet Approval: 29.02.2024 (₹75,021 Cr outlay). Issued under MNRE Operational Guidelines for PM Surya Ghar: Muft Bijli Yojana (F. No. 318/17/2024-GCRT).

  • General States: ₹30k (1 kW), ₹60k (2 kW), ₹78k cap (≥3 kW).
  • Special Category: ₹33k (1 kW), ₹66k (2 kW), ₹85.8k cap (≥3 kW).
  • GHS / RWA: ₹18,000/kW for common areas (up to 500 kW).
  • Non-negotiable direct central DBT credit.
2. Administrative & Utility Prerequisites

Compliance mandates established by MNRE and State Electricity Regulatory Commissions (SERCs):

  • Application strictly via pmsuryaghar.gov.in.
  • Modules must comply with ALMM and Domestic Content Requirement (DCR).
  • Installation exclusively through portal-empanelled vendors.
  • Technical feasibility approval & bidirectional meter by DISCOM.
  • DBT disbursed post DISCOM inspection and commissioning certificate.
3. Illustrative Engineering Assumptions

Planning assumptions modeled to estimate real-world performance (NOT statutory mandates):

  • Turnkey Cost: ~₹50,000 to ₹65,000/kW (user-adjustable).
  • Specific Yield: ~120 kWh/kW/month (~4.0 kWh/kWp/day).
  • Concurrency: 60% daytime self-consumption, 40% export.
  • Lifecycle: 0.70%/yr degradation; Year-12 inverter replacement.
  • Fixed Charges: Statutory grid charges remain payable.

Rooftop Solar Cost Breakdown (Illustrative Planning Model)

Under the PM Surya Ghar scheme, the Central Government no longer fixes benchmark turnkey prices. System costs are determined competitively by empanelled vendors based on hardware quality, inverter brand, structure height, and cabling length. The following represents an illustrative planning model of typical hardware and labor allocations:

Solar PV Modules
~45% – 55% (Illustrative)

Mono-PERC or TOPCon bifacial/half-cut panels complying with MNRE ALMM and DCR mandates.

Grid-Tied Inverter
~15% – 22% (Illustrative)

Single or three-phase on-grid string inverter with anti-islanding safety features and MPPT tracking.

Mounting Structures
~10% – 15% (Illustrative)

Hot-dip galvanized iron (HDGI) or anodized aluminum structures engineered for local wind loads.

Balance of System (BOS)
~8% – 12% (Illustrative)

ACDB/DCDB protection boxes, SPD surge suppressors, DC solar cables, chemical earthing, and lightning arrestor.

Installation & DISCOM Fees
~7% – 12% (Illustrative)

Civil/electrical labor, net-meter procurement/testing charges, and DISCOM inspection application costs.

*Disclaimer: Percentages and cost ranges above are indicative planning benchmarks for residential installations. Actual quotes differ across vendors, rooftop height/elevation requirements, and DISCOM bidirectional meter processing schedules.