BESCOM (Bangalore Electricity Supply Company Limited) Electricity Tariff Schedule 2026
Source-traceable residential tariff record, calculation details, and regulatory order references for BESCOM consumers in Karnataka.
Provisional Model • KERC
Provisional baseline for Bangalore Electricity Supply Company Ltd.. Calibrated against regulatory filings pending automated gazette ingestion.
BESCOM Official Tariff Schedule & Regulatory Dossier
Statutory tariff rates, progressive consumption slabs, sanctioned load fixed charges, and worked bill calculations approved by the KERC.
1. Official Regulatory Framework
| Regulator | Tariff Order / Docket | Effective Cycle | Electricity Duty | Fixed / Wheeling Model |
|---|---|---|---|---|
| KERC | KERC Combined ESCOMS Tariff Order 2025 (FY 2025-26 to FY 2027-28) | 2026-04-01 | 9% | ₹150/mo (or per kW) |
2. Domestic Low-Tension (LT) Tariff Slabs
| Slab Range (kWh) | Base Energy Charge (₹/Unit) | Wheeling Charge (₹/Unit) | Regulatory Surcharge / FPPPA | Effective Rate (₹/kWh) |
|---|---|---|---|---|
| > 0 Units | ₹5.80 | ₹0.00 (Bundled) | Applicable per SERC review | ₹5.80 |
3. Sanctioned Load & Monthly Fixed Demand Charges
| Sanctioned Load (kW) | Connection Phase | Monthly Fixed Demand Charge (₹) | Annual Standing Cost (₹) |
|---|---|---|---|
| 1 kW | Single Phase (1-Ph) | ₹150.00 | ₹1800.00 |
| 2 kW | Single Phase (1-Ph) | ₹300.00 | ₹3600.00 |
| 3 kW | Single Phase (1-Ph) | ₹450.00 | ₹5400.00 |
| 5 kW | Single Phase (1-Ph) | ₹750.00 | ₹9000.00 |
| 10 kW | Three Phase (3-Ph) | ₹1500.00 | ₹18000.00 |
4. Pre-Calculated Worked Bill Scenarios (Deterministic Engine Receipts)
5. Frequently Asked Questions — BESCOM Electricity Tariffs
What is the per unit rate for BESCOM in 2026?▾
Domestic electricity tariffs for BESCOM are structured under progressive slabs approved by the KERC. Rates begin at ₹5.80 for the lifeline consumption tier and scale up to ₹5.80 for higher monthly consumption, plus applicable wheeling charges and regulatory surcharges.
How much is a 200 units electricity bill in BESCOM?▾
For a typical residential connection with 2 kW sanctioned load, a monthly consumption of 200 units in BESCOM results in an estimated bill of approximately ₹1690, covering slab energy charges, sanctioned load fixed charges, and statutory state electricity duty.
What is the fixed charge per kW in BESCOM?▾
BESCOM applies a monthly fixed standing demand charge of approximately ₹150 per month for a standard 1 kW domestic connection, scaling proportionately with higher sanctioned capacity (2 kW, 3 kW, 5 kW, etc.) in accordance with KERC regulations.
How are electricity duty and fuel surcharges calculated for BESCOM?▾
State electricity duty is levied as a percentage (9%) on your consumption charges. Fuel Adjustment Charges (FAC / FPPPA / PPAC) are periodically approved by the KERC to reflect actual generation and power procurement fuel costs.
BESCOM 100, 200, 300 to 500 Units Electricity Bill Rate Chart (2026)
Pre-calculated statutory domestic electricity bills for 50 kWh up to 1,000 kWh monthly consumption under KERC multi-year tariff orders. All amounts include telescopic energy slabs, standing load charges, applicable government subsidies, and state electricity duties.
| Units (kWh) | Energy Charges | Fixed + Wheeling | Govt Subsidy | Duty / Tax % | Total Bill Payable (₹) | Avg Rate / Unit (₹) | PM Surya Ghar Solar Offset |
|---|---|---|---|---|---|---|---|
50 Units(1 kW) | ₹290 | ₹150 | ₹0 | 9% | ₹513 | ₹10.25 | Grid Lifeline |
100 Units(1 kW) | ₹580 | ₹150 | ₹0 | 9% | ₹875 | ₹8.75 | Grid Lifeline |
150 Units(1 kW) | ₹870 | ₹150 | ₹0 | 9% | ₹1,238 | ₹8.25 | Grid Lifeline |
200 Units(2 kW) | ₹1,160 | ₹300 | ₹0 | 9% | ₹1,750 | ₹8.75 | Grid Lifeline |
250 Units(2 kW) | ₹1,450 | ₹300 | ₹0 | 9% | ₹2,113 | ₹8.45 | Grid Lifeline |
300 Units(2 kW) | ₹1,740 | ₹300 | ₹0 | 9% | ₹2,476 | ₹8.25 | 2 kW (₹60,000 Sub) ➔ |
400 Units(3 kW) | ₹2,320 | ₹450 | ₹0 | 9% | ₹3,351 | ₹8.38 | 3 kW (₹78,000 Sub) ➔ |
500 Units(3 kW) | ₹2,900 | ₹450 | ₹0 | 9% | ₹4,076 | ₹8.15 | 3 kW (₹78,000 Sub) ➔ |
750 Units(4 kW) | ₹4,350 | ₹600 | ₹0 | 9% | ₹6,039 | ₹8.05 | 4 kW (₹78,000 Sub) ➔ |
1000 Units(5 kW) | ₹5,800 | ₹750 | ₹0 | 9% | ₹8,002 | ₹8.00 | 5 kW (₹78,000 Sub) ➔ |
Consuming 300+ Units per Month? Eliminate Higher Slabs with Rooftop Solar
Under the PM Surya Ghar scheme, residential households installing 2 kW to 3 kW rooftop solar qualify for direct central government subsidies of ₹60,000 to ₹78,000. At 300+ units monthly, solar offsets your entire peak slab charges, recovering your investment within 3 to 4 years.
* Calculated based on standard domestic single-phase and three-phase sanctioned load norms (1 kW to 5 kW). Actual bills may vary slightly with monthly floating Fuel Adjustment Surcharges (FAC / FPPPA).
Calculate Exact Custom Load & Units Bill➔Illustrative Tariff Analysis: How a 35-Day Reading Cycle Triggers a Progressive Slab Jump
In India's progressive and telescopic tariff structures, your bill doesn't just rise proportionally with consumption—crossing an arbitrary slab threshold or having your meter read on day 35 instead of day 30 can cause an immediate non-linear tariff shock.
When meter readers arrive strictly every 30 days, your daily consumption (~10 units/day) matches the SERC-mandated monthly slab allotments (e.g. 0–100, 101–300 units).
If the DISCOM meter reader arrives 5 to 15 days late without applying pro-rata slab expansion, the extra units push your consumption into the highest penal slabs (often 40% to 60% higher cost per unit).
How to Protect Yourself & Claim Statutory Rectification:
- Check the "Bill Period / Reading Days" Field: Inspect your paper or digital bill. If reading days exceed 32 days, verify whether the DISCOM applied pro-rata telescopic slab expansion under State Electricity Regulatory Commission (SERC) Supply Code regulations.
- Audit with Bill Doctor: Paste your billed units and billing dates into our Electricity Bill Analyzer (Bill Doctor) to calculate your exact statutory entitlement and reveal overbilled amounts.
- Generate a Formal Legal Complaint: If an elongated billing cycle pushed you into a higher slab, use our Electricity Bill Complaint Letter Generator to create a formal notice citing Section 56 of the Electricity Act 2003 for submission to your Sub-Divisional Officer (SDO) or Consumer Grievance Redressal Forum (CGRF).
₹1963.00
ಸರಾಸರಿ ಪ್ರತಿ ಯೂನಿಟ್ ವೆಚ್ಚ: ₹7.85/unitYour Estimated Bill
At 250 units, your electricity costs about ₹1,963.
Where is your money going?
How your units are priced
Electricity gets more expensive the more you use. Your first few units are cheap, but your final units are charged at a much higher rate.
* FPPCA fuel surcharge applied at ₹0.37/kWh [DEFAULT_ILLUSTRATIVE]. (Source: KERC Combined ESCOMS Tariff Order 2025 (FY 2025-26 to FY 2027-28))
Interactive Scenario Modeling
See how small changes in your monthly electricity consumption impact your total bill.
Regulatory Provenance & Verification Trail
Regulatory Document: KERC Schedule of Retail Tariff for LT-1 Domestic Installations (Annexure 9)
Source URL: https://kerc.karnataka.gov.in
SHA-256: d84997a4f7195b5c4ebb94064bd15428d2e8657c4f53e1671a074200595fcf50
Regulatory Document: KERC Schedule of Retail Tariff for LT-1 Domestic Installations (Annexure 9)
Source URL: https://kerc.karnataka.gov.in
SHA-256: d84997a4f7195b5c4ebb94064bd15428d2e8657c4f53e1671a074200595fcf50
Regulatory Document: KERC Annual Electricity Tariff Revision Order 2023
Source URL: https://kerc.karnataka.gov.in
SHA-256: UNVERIFIED_PENDING_INGESTION
Bangalore Electricity Supply Company Limited (BESCOM) Citizen Helpdesk
Pay electricity bills directly on the official BESCOM government portal with zero hidden convenience fees.
Download duplicate monthly bill copy & tax invoice using your Consumer ID / Account Number / CA Number.
Register power outage, voltage fluctuation, or incorrect meter billing complaints via statutory 1912 helpline or SERC CGRF.
💡 Important Consumer Advisory (बिजली उपभोक्ता सूचना):
BijliWise is an independent statutory electricity tariff intelligence and bill auditing platform. We never ask for bank details, OTPs, or process direct financial payments. Always pay your electricity bills only through verified official DISCOM portals (https://bescom.karnataka.gov.in) or authorized Bharat BillPay (BBPS) channels.
How Electricity Billing Works in BESCOM (Bangalore Electricity Supply Company Limited)
Approved Tariff Schedules, Connection Regulations & Consumer Guidelines issued by the KERC.
1. Domestic LT-1 Consumption Slabs & Energy Charges
The active residential record below is rendered directly from its verified versioned tariff data. Rates and slab boundaries are specific to this utility and category.
2. Fixed Monthly Connection Charges & State Electricity Taxes
Every monthly electricity bill issued by BESCOM includes fixed infrastructure charges and government duties alongside your variable energy consumption:
- Sanctioned Load Fixed Charge: Charged per kilowatt (kW) or per connection per month to maintain local sub-stations and transformer distribution networks.
- State Electricity Duty: Tax collected on behalf of the Karnataka State Government, calculated as a percentage on the net energy bill.
- Fuel Adjustment Surcharges (FPPCA / FAC): Fluctuating fuel cost adjustments approved periodically by KERC.
3. Checking Your BESCOM Bill & Online Payment Options
To check your live bill or pay your outstanding balance online, use your unique 10 to 12-digit Consumer Number (CA Number / Account ID) printed on your bill statement:
4. Consumer Grievance Redressal Mechanism & Dispute Filing
If your BESCOM bill exhibits erroneous meter readings, disputed arrears, or uncredited subsidy payments, you can register a formal complaint with the Consumer Grievance Redressal Forum (CGRF) or call the centralized consumer helpline at 1912. Under Section 56(1) proviso of the Electricity Act 2003, power supply cannot be disconnected during a bona fide dispute if average consumption charges are deposited under protest.
Recommended Energy Calculation & Audit Tools
Simulate monthly bills across progressive slabs with live duty and fixed charges.
Upload a bill photo or PDF to verify tariff rates, units consumed, and hidden penalties.
Generate an official Section 56(1) dispute or meter inspection letter for BESCOM.